The final blast in 2019
[date]
[date]
At 1 PM on Thursday the 19th of December the last remaining building, the red Denox-building, at Enstedværket in Aabenraa went to the ground. After six months of cutting, blowtorching, sorting, hauling and shipping off steel and metals, we finally had the ground cleared of all remains of the huge boiler building that we took down in May. It was time to end 2019 with a final blast!
As calculated by our demolition experts, the Denox-building fell exactly at the designated spot, and for the next couple of months we will once again be absorbed in cutting, blowtorching, sorting, hauling and shipping off steel and metals. Remaining now is only the chimney with its 184 meters of armoured concrete. We look forward to having a blast in 2020 as well!