In 2016 RIMECO bought the coalfired powerstation Enstedværket from DONG (now Ørsted).
After less than 2 years demolition time, the boiler house was overturned on 23rd May-19 by means of a controlled explosion.
It was necessary to overturn the building due to heavy machinery in the upper part of the building otherwise not being accessible.
Next step is to clear the area from the overturned building during the summer months.